Dear Observatory Staff and Global 3mm VLBI PIs, Please find below Version 2 of the Block Schedule for the coming Global 3mm VLBI session in October. The projects which are scheduled have been approved by the VLBA Scheduler and myself, on the basis of the proposal reviews in Europe and at NRAO. Thomas Krichbaum will assist in making an integrated observing schedule for the session, and PIs are asked to contact him, to specify to what extent they wish to be involved in the schedule making for the part of the schedule when their source(s) is (are) being observed. ===> Please contact him by 10th SEPTEMBER ************** The final, integrated schedule will be made available to the observatories by 24th SEPTEMBER, 2 weeks before the start of the session on 8th OCTOBER. Antennas -------- The antennas available at the VLBA are NL,FD,LA,PT,KP,BR,OV,MK. The European telescopes ("Eu" on the block schedule) are Pico Veleta, Plateau de Bure, Effelsberg, Onsala-20m and Metsahovi. Recording mode -------------- All GMVA continuum projects will be observed with a recorded bit-rate of 512 Mb/s, since at 3mm wavelength the short atmospheric coherence is the main limitation to detection sensitivity. All observatories will record using MK5 disk systems, with correlation at the Bonn DiFX software correlator. MK5 disk availability, and VLBA disk-change logistics will determine the fraction of the scheduled time which can be spent recording data. Walter Alef will make a final decision on this when all the constraints have been considered. Polarization ------------ Note that both GT008A, GT008B request dual LHC+RHC recording at observatories where this is possible. GL035 requests LHC. General considerations ---------------------- ===> Please contact me (porcas@mpifr-bonn.mpg.de) IMMEDIATELY if you find any mistakes or problems with this version of the schedule. Regards Richard Porcas (European Global 3mm VLBI Scheduler) ==================================================================================================== Schedule Version 2.0 (29 August) GMVA OCTOBER 2010 ================================= ===================== START CODE PI SOURCE POL DAY NO. UT-START UT-STOP COMMENTS ====== ============= ================== === ====== =========== =========== ================== GT008A TRIPPE 0954+658 L+R Eu 281 0800(08/10)-2000(08/10) US 281 0800(08/10)-2000(08/10) GL035A LOBANOV source survey L Eu 281 2000(08/10)-1000(11/10) 62 hours US 281 2000(08/10)-1000(11/10) 62 hours GT008B TRIPPE 1308+326 L+R Eu 284 1030(11/10)-1830(11/10) US 284 1330(11/10)-2230(11/10) ====================================================================================================