Effelsberg station report ========================= * A dBBC and Mark5B have been installed in the Faraday room. Placing this in the Faraday room will avoid interference to other observations, caused for example by 10GE network equipment. It is now fully connected and zero baseline test against the Mk4 and VLBA terminal are under way. * A NRAO RDBE and upgrade kits for two Mark5C units are ordered. * A 10GE switch was bought to connect the two Mark5C to the dBBC and the RDBE. * In August/September a new 18/21cm prime focus receiver was installed. Tsys is about 25 K. The receiver was successfully used during e-VLBI observations and in EVN Session 3. It shares one prime focus box with three other receivers (1.0cm, 1.9cm, and a receiver to do holography at 11.7 GHz). Although those are not used for VLBI it increases our flexibility to schedule different projects including VLBI observations.