Torun (Tr) Station Report

(TOG, Dwingeloo, March 24th 2006)


Brief Report of Last EVN Sessions


In the October/November 2005 session three experiments were practically lost (one accidentally erased inclusive) due to problems resulting from a bad disk-pack and for subsequent want of disk space.
In the February/March 2006 session major losses in M-band experiments (5 of them lost or severely affected) resulted from a failure in our telescope elevation drive. Also, there were problems with our phase-cal (at C-band) and occasional malfunctioning of BBC8.

Changes/Upgrades Made to Hardware/Software


There were no changes in this category.
FS 9.7.7 version has been used in both the sessions.
Mark5A version used was 2005y147d11h.
Mark5A Linux version 2.4.20-6 (OS rev2: 3.2.2 20030222 (Red Hat Linux 3.2.2-5)).

e-VLBI


The station has regularly participated in all the testing and demonstration experiments organized by JIVE. Our 1Gb/s connection experiences various problems so that its speed, although sometimes as high as 700 Mb/s, presently allows for a reliable sustained transmission at 128 Mb/s only.

Kaz Borkowski, Roman Feiler & Greg Hrynek