Onsala Station report: * 20 m telescope: The installation of the new control system has been completed. This has solved the problem with occasionally antenna stops during slewing. * 20 m telescope: We have upgraded our 22/43 GHz system to dual polarisation. * 20m telescope: The radom was painted during the summer. * Mark 5: We have purchased 10 Mark 5 modules and we plan to populate them with 250 GB disks during the winter. Thus, we will reach the goal of 100 TB before the end of 2006 (105 TB). * EVN-session 2 2006: Severe RFI-problem in the UHF-session. Otherwise, no major problem.