Seshen25 report--Nov. 2004 Field System New FS computor has been used since April this year. The FS system was updated to FS 9.7.0. H-maser New MHM2010 maser was installed on April 2004, and has been used since May 2004. it works normally. receiver A new 13cm single polarization (RCP) receiver system is installed at the prima focus in Seshan. Frequency 2000-2500 MHz, SEFD not measured yet. A New C-Band cryogenic dual-circular-polarized front-end, which covers 4650-5150MHz frequency range, has been installed onto our telescope. The first commissioning of this front-end is for the EVN session 3/2004. Future Developing Mini DBBC for Lunar project. The L-band refrigeration dual polarization receiver system is building at ASTRON. New S/X band receiver. The servo system and drive system of 25m antenna will be upgraded. The should be finished at the end of 2005.